Six to ten weeks is the comfortable window for a Boston date. Our shop is in Fullerton, 2,580 miles away, so presses go out by freight and the crew flies in the day before load-in. Shipping and the venue's move-in schedule set the timeline more than press availability does.
Where the weeks go
- Freight: presses, dryers, blanks and tables get packed, shipped and onto your venue's dock before the crew lands.
- Art: final art about a week out, so screens can be burned and DTF transfers printed before everything ships.
- Blanks: the garment order locks around the same point, sized to your headcount across XS–4XL. A headcount that keeps moving delays a Boston job more often than anything else.
- The venue: the BCEC and Hynes run move-in on their own schedules, and a big show week tightens hotels and labor across the city.
Short notice? Ask anyway. Simple art and standard blanks are what make a tight Boston date possible, and the travel line is kinder with more lead time. Send the date and headcount and we'll confirm availability within 24 hours.
The Boston calendar
May, June and September are when the city's calendar stacks up: commencement and reunion weeks, June conference season at the BCEC, and campus kickoffs when students come back. If your event lands in one of those stretches, book toward the long end of the window. Date changes are easiest with two weeks' notice, because the freight is already scheduled by then.